top of page


Polynesian 5W-ILF Recovery Part 2: Engineering the Lift in Apia
Polynesian 5W-ILF Recovery: Engineering the Lift in Apia
After publishing my initial analysis of the runway incident in Apia, a former engineer involved in the recovery contacted me with detailed operational insight.
With permission, I’ve published a Part 2 focusing on the mobilisation, centre-of-gravity management, and lifting sequence used to return the aircraft to serviceable ground handling condition.
What stands out most is the discipline and collaboration.
Craig Reid
Feb 153 min read
bottom of page